2015-2017 |
Construction completion and commissioning of the HPP on the Cora River with installed capacity of 28.5 MW |
|
2015-2016 |
HPS-2 Hydropower station that power is 16.99 mWt based on river Lepsy has been compleated |
|
2013-2014 |
Prefabrication construction shop is established as a part of Temirbeton LLP that manufactures a wide range of construction products required for construction of accommodations of the 3rd and 4th class of comfort under the state-run program “Dostupnoye Zhilye (Affordable Housing) 2020”. |
|
2010 |
Established a branch of ASPMK-519 in Ashgabat, Turkmenistan. |
|
Established the East Siberian branch of ASPMK-519 in Krasnoyarsk, Russian Federation. |
||
Completed construction and commissioned Karatal HPP-4 with installed power of 3.2 MW. | ||
2009 |
Completed construction and commissioned Karatal HPP-3 with installed power of 4.4 MW. |
|
Established the branch of ASPMK-519 in Bishkek, Kyrgyz Republic. |
||
Established the branch of ASPMK-519 in Dushanbe, Republic of Tajikistan. | ||
2008 |
Completed construction and commissioned Karatal HPP-2 with installed power of 4.4 MW. |
|
2007 |
To diversify the holding's activity, a new business area – electric power production and transmission – was begun and developed. |
|
Becoming a member of Interinvestizolyator LLC (RF) which is involved in production of polymer insulators. |
||
2004 |
Established the engineering center within the ASPMK-519 companies group and several established designing companies. |
|
Registered new and several joint construction and installation companies. | ||
2002-2004 |
Development of several new business activities: |
|
2001 |
Established a subdivision for electric power purchase and sale. |
|
Established the affiliated company – TK Metakon LLC and production development of metal structures for electric power lines, metal structures for reinforced concrete support poles, steel concrete shuttering for reinforced concrete structures employing hot dip galvanization technology. | ||
2000 | Beginning of the holding structure formation and realization of the company's vertical integration strategy. the ASPMK-519 company manages production development of reinforced concrete, centrifugally-cast, vibrated support poles for 0.4-220 kW electric lines and substations' reinforced concrete parts performed by the established affiliated company - Temirbeton LLC. A new company, Energo-REM LLC was established to perform construction and installation work. | |
ASPMK-519 LLC was established. |